What information does it need to confirm the quotation?
Detailed drawings of parts (three-view engineering drawings, 3D drawings), procurement quantity, material grade requirements, any surface treatment requirements.
Production cycle: Confirm the drawings, manufacture the molds, and produce the samples. After sample confirmation, it will take 35 to 50 days.